Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the twentyseventeen domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/solargy/www/wp-includes/functions.php on line 6121
Rural electrification in Madagascar – Solar Gem

Rural electrification in Madagascar

[et_pb_section fb_built=”1″ _builder_version=”4.16″ _module_preset=”default” global_colors_info=”{}” theme_builder_area=”post_content”][et_pb_row _builder_version=”4.16″ _module_preset=”default” global_colors_info=”{}” theme_builder_area=”post_content”][et_pb_column type=”4_4″ _builder_version=”4.16″ _module_preset=”default” global_colors_info=”{}” theme_builder_area=”post_content”][et_pb_text _builder_version=”4.16″ _module_preset=”default” global_colors_info=”{}” theme_builder_area=”post_content”]

The Project

2 MWp of Solar GEM® with 2,1 MWh of Storage  and diesel genset, shared between 3 sites and operated by villagers.

The hybrid power plants will be established to provide 24-hours access to electricity for 400 households in the villages in Indonesia.

The energy produced is solded to villagers at the standard rate of energy in Indonesia. The hybrid power plants are managed by a villagers-owned organization.

2018,Berau province, East Kalimantan,Indonesia, 1MWp, 13 Solar GEM®  

 